|
Malmesbury C of E Primary School
A three day project to give the school a much needed face lift.
Day one involved two assemblies and thirteen workshops in which we discussed design, context and colour.
We then took recurring ideas and images such as the river, the abbey, surrounding countryside and sunshine from over 400 childrens drawings and produced a final design.
The mural took two days to paint and reflects the atmosphere of the school and the town in which it is situated.
next project >
|